wells
wells
Well lining poses challenges of scale, as the time spent on the underground work must be kept as short as possible and maximum safety ensured.
The slip forming technique used by ROYAM for wells combines speed, quality and safety as well as, depending on well depth and personnel, the option of:
- Simultaneous reinforcement and concreting
or
- Consecutive reinforcement and concreting
In the same category Slipform
siloswater towersWind MillCaissons - BreakwaterMinaretswells
damfactories, building, central coresilo repair80m deep shaft lining with dedicated gantry slipform method, Túnel de trasvase Yacambú, Venezuela - 2011